• About us
  • Contact us
Monday, October 27, 2025
Dateline Islamabad
No Result
View All Result
  • Login
  • Home
  • E-Paper
  • National
  • Current Affairs
  • International
  • Opinion
  • World Digest
  • Business
  • Entertainment
  • Sci-Tech
  • Health
  • Sports
  • Home
  • E-Paper
  • National
  • Current Affairs
  • International
  • Opinion
  • World Digest
  • Business
  • Entertainment
  • Sci-Tech
  • Health
  • Sports
No Result
View All Result
Morning News
No Result
View All Result
Home National

Wali gas field supply injected into SNGPL’s network

Daily Dateline Islamabad by Daily Dateline Islamabad
June 17, 2023
in National
0
Wali gas field supply injected into SNGPL’s network
0
SHARES
19
VIEWS
Share on FacebookShare on Twitter
ISLAMABAD (DL News) – In a landmark development, injection of gas supply into SNGPL’s network from OGDCL’s newly discovered gas field, namely Wali (Bettani) in District Lakki Marwat of Khyber Pakhtunkhwa, started on Friday.The Oil and Gas Development Company (OGDCL) had discovered the Wali gas field last year. Accordingly, Prime Minister Shehbaz Sharif and Federal Ministry of Energy (Petroleum Division) had directed SNGPL to lay pipelines for the injection of gas from the newly discovered gas field.

The gas flow from Wali gas field will be processed at OGDCL’s facility before being injected into Sui Northern’s transmission system. The current gas supply flowrate from the gas field is 10 MMCFD, which is expected to rise to 20 MMCFD in the near future.

The gas is supplied via a recently constructed 50-kilometre long high-pressure pipeline connecting OGDCL’s processing plant to Sui Northern’s network at Kaka Khel, District Lakki Marwat. In addition, SNGPL also constructed a 16-kilometre-long gathering line at OGDCL’s request as a contractor.

READ ALSO

ITP Issues traffic diversion plan for under-construction Shaheen Chowk

Universities directed to ensure MDCAT arrangements

Earlier, the SNGPL faced security issues during the construction of pipelines, but despite all the odds, the company efficiently managed to complete the construction of 66-kilometre-long pipelines of 8-inch diameter from Wali Well to Kakakhel Valve Assembly in the shortest possible time.

Both pipeline segments, consisting of a 16-kilometre segment from the well to the processing plant and a 50-kilometre segment from the processing plant to Kakakhel Valve Assembly, were successfully commissioned on June 14 and 15, respectively.

The on-time completion of the pipeline construction project for injection of gas, which carries significant national importance owing to the prevailing energy crisis, was only made possible through the guidance of the company’s Board of Directors and the current management, along with the steadfast dedication and hard work of SNGPL’s workforce.

Related Posts

ITP delivers doorstep services to citizens: mobile vans, women’s helpline, & roadside assistance
National

ITP Issues traffic diversion plan for under-construction Shaheen Chowk

October 25, 2025
Universities directed to ensure MDCAT arrangements
National

Universities directed to ensure MDCAT arrangements

October 25, 2025
OGRA advances digitalization of oil supply chain with nationwide track, trace system
National

Tanker Association representatives meet OGRA officials

October 25, 2025
SSP Usman Butt meets murder case complainants to ensure justice & relief
National

SSP Usman Butt meets murder case complainants to ensure justice & relief

October 25, 2025
CM promises facilities for special persons
National

Achieving 100pc Polio eradication is our collective mission: CM

October 25, 2025
Unidentified body recovered from Shahdara Road
National

19 outlaws nabbed, drugs and weapons recovered

October 25, 2025
Next Post
Alberta offers a high number of vacancies for truck drivers

Alberta offers a high number of vacancies for truck drivers

POPULAR NEWS

FAO Employee’s Death Sparks Outcry Over Workplace Stress

FAO employee’s death sparks outcry over workplace stress

March 5, 2025
Nepotism and Incompetence rampant in CDA’s appointments

Nepotism and Incompetence rampant in CDA’s appointments

June 7, 2023
Major Police transfers and postings ordered in Punjab

Major Police transfers and postings ordered in Punjab

May 30, 2024
PWD Chief Engineer placed on ECL by PAC

PWD Chief Engineer placed on ECL by PAC

May 31, 2023
Allegations of injustice and corruption surface within CDA

Allegations of injustice and corruption surface within CDA

July 4, 2023

EDITOR'S PICK

August 19, 2022
Belarus President arrives in Islamabad on three-day official visit

Belarus President arrives in Islamabad on three-day official visit

November 26, 2024
No eight-hour gas loadshedding in Rawalpindi: SNGPL

No eight-hour gas loadshedding in Rawalpindi: SNGPL

December 30, 2024

September 14, 2022